Event Summary
 
  FILE SAVED AS: ONT_9159_20200409_0755.htm  
 
 Incident:   ONT_9159_20200409_0755   Date:  04/09/2020 (CST)   Reliability Coordinator:  ONT 
 Initial Conditions:   LEC 150 MW CW. Ont-Mich PARS on top tap
 Flowgate:   9159 - ONTARIO-ITC   Rating:  0   LODF:   N/A
 TLR Direction:   Normal 
 Effective StartTime:   04/09/2020 07:55 (CST)   Effective EndTime:  04/10/2020 00:25 (CST)   TLR Duration:  16 Hours and 30 Minutes
 
TLR Actions
 Confirm 
 Time 
 Level   Effective 
 Hour 
 Priority   Schedule   NNL Relief   Market Relief   Flow   Cont. 
 Flow 
 TLR Action Comments 
 Total Tags 
 Cut / Hold 
 IDC Cut   RC Cut 
 Acknowledge 
 Hold   CA   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Type   Mkt   IDC 
 MW 
 RC 
 Ackn 
 MW 
 Current   Post 
 Cont. 
 MW   Relief   MW   Relief   MW   Relief 
Apr 09 
07:35 (CST) 
 TLR 1   CURRENT   NONE   NONE   NONE   1600   N/A  N/A LEC ~150 CCW.PARS on Max tap
Apr 09 
08:24 (CST) 
 TLR 3A 
 PRELIM 
 NEXT 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 8 / 0 
 2 / 0 
 1 / 0 
 7 / 0 
 18  /  0 
 1325 
 450 
 100 
 1360 
 3235 
 77.5 
 26.3 
 5.9 
 79.6 
 189.3 
 0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 MISO 
 MISO 
 MISO 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC -127 CCW. Interface Flow 1527 MW. Schedule Of 1400 MW.
Apr 09 
08:31 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 8 / 6 
 2 / 0 
 1 / 0 
 7 / 2 
 18  /  8 
 1325 
 450 
 100 
 1360 
 3235 
 77.5 
 26.3 
 5.9 
 79.6 
 189.3 
 1325 
 450 
 100 
 1360 
 3235 
 77.5 
 26.3 
 5.9 
 79.6 
 189.3 
 614 
 0 
 0 
 200 
 814 
 35.9 
 0.0 
 0.0 
 11.7 
 47.6 
 NONE 
 ED-2 
 ED-6 
 FIRM-7 
 Total 
 MISO 
 MISO 
 MISO 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC -127 CCW. Interface Flow 1527 MW. Schedule Of 1400 MW.
Apr 09 
09:35 (CST) 
 TLR 3A   NEXT 
 1-NS 
 2-NH 
 6-NN 
 Total 
 1 / 0 
 12 / 5 
 0 / 2 
 13  /  7 
 103 
 1380 
 0 
 1483 
 6.0 
 101.1 
 0.0 
 107.2 
 103 
 1380 
 0 
 1483 
 6.0 
 101.1 
 0.0 
 107.2 
 0 
 466 
 200 
 666 
 0.0 
 34.1 
 14.7 
 48.8 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 65 CW. Interface Flow 1230 MW. Schedule Of 1295 MW.
Apr 09 
10:28 (CST) 
 TLR 3A   NEXT 
 1-NS 
 2-NH 
 6-NN 
 Total 
 5 / 0 
 15 / 1 
 0 / 2 
 20  /  3 
 311 
 1811 
 0 
 2122 
 18.6 
 150.6 
 0.0 
 169.3 
 311 
 1811 
 0 
 2122 
 18.6 
 150.6 
 0.0 
 169.3 
 0 
 100 
 200 
 300 
 0.0 
 8.5 
 17.1 
 25.6 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 81 CCW. Interface Flow 1389 MW. Schedule Of 1308 MW
Apr 09 
11:30 (CST) 
 TLR 3A   NEXT 
 1-NS 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 1 / 0 
 13 / 2 
 1 / 0 
 1 / 0 
 1 / 2 
 17  /  4 
 103 
 1775 
 300 
 100 
 63 
 2341 
 5.9 
 127.8 
 21.6 
 7.2 
 4.5 
 167.0 
 103 
 1775 
 300 
 100 
 63 
 2341 
 5.9 
 127.8 
 21.6 
 7.2 
 4.5 
 167.0 
 0 
 2 
 0 
 0 
 200 
 202 
 0.0 
 0.1 
 0.0 
 0.0 
 14.4 
 14.5 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 181 MW CW. Flow Of 1185. Schedule of 1350.
Apr 09 
12:33 (CST) 
 TLR 3A   NEXT 
 1-NS 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 1 / 0 
 13 / 0 
 1 / 0 
 1 / 0 
 8 / 0 
 24  /  0 
 103 
 1775 
 300 
 100 
 1460 
 3738 
 5.9 
 127.0 
 21.5 
 7.2 
 104.4 
 265.9 
 103 
 1775 
 300 
 100 
 1460 
 3738 
 5.9 
 127.0 
 21.5 
 7.2 
 104.4 
 265.9 
 0 
 0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC at 100 CCW. Schedule Of 1350. Flow of 1450 MW
Apr 09 
13:32 (CST) 
 TLR 3A   NEXT 
 1-NS 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 1 / 0 
 11 / 2 
 1 / 0 
 1 / 0 
 8 / 0 
 22  /  2 
 103 
 1475 
 300 
 100 
 1460 
 3438 
 6.8 
 116.9 
 23.8 
 7.9 
 115.7 
 271.0 
 103 
 1475 
 300 
 100 
 1460 
 3438 
 6.8 
 116.9 
 23.8 
 7.9 
 115.7 
 271.0 
 0 
 2 
 0 
 0 
 0 
 2 
 0.0 
 0.2 
 0.0 
 0.0 
 0.0 
 0.2 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 140 MW CW. Flow Of 1210. Schedule of 1350.
Apr 09 
14:32 (CST) 
 TLR 3A   NEXT 
 1-NS 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 7-F 
 Total 
 1 / 0 
 7 / 3 
 1 / 0 
 1 / 0 
 7 / 0 
 0 / 1 
 17  /  4 
 103 
 1075 
 300 
 100 
 1400 
 0 
 2978 
 6.9 
 86.7 
 24.2 
 8.1 
 112.9 
 0.0 
 238.9 
 103 
 1075 
 300 
 100 
 1400 
 0 
 2978 
 6.9 
 86.7 
 24.2 
 8.1 
 112.9 
 0.0 
 238.9 
 0 
 152 
 0 
 0 
 0 
 18 
 170 
 0.0 
 12.3 
 0.0 
 0.0 
 0.0 
 10.6 
 22.9 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 100 MW CW. Flow Of 1157. Schedule of 1257.
Apr 09 
15:28 (CST) 
 TLR 3A   NEXT 
 1-NS 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 4 / 6 
 8 / 2 
 2 / 1 
 1 / 0 
 7 / 0 
 22  /  9 
 256 
 1175 
 377 
 100 
 1400 
 3308 
 17.8 
 105.6 
 32.8 
 9.3 
 130.6 
 296.2 
 256 
 1175 
 377 
 100 
 1400 
 3308 
 17.8 
 105.6 
 32.8 
 9.3 
 130.6 
 296.2 
 300 
 2 
 199 
 0 
 0 
 501 
 18.8 
 0.2 
 18.6 
 0.0 
 0.0 
 37.5 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 25 MW CW. Flow Of 1357. Schedule of 1382.
Apr 09 
16:29 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 6 / 2 
 2 / 0 
 1 / 0 
 7 / 0 
 16  /  2 
 925 
 500 
 100 
 1400 
 2925 
 73.2 
 39.6 
 7.9 
 110.8 
 231.4 
 925 
 500 
 100 
 1400 
 2925 
 73.2 
 39.6 
 7.9 
 110.8 
 231.4 
 250 
 0 
 0 
 0 
 250 
 19.8 
 0.0 
 0.0 
 0.0 
 19.8 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 9MW CCW. Flow of 1389. Schedule of 1400.
Apr 09 
17:32 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 9 / 3 
 3 / 0 
 1 / 0 
 7 / 0 
 20  /  3 
 1175 
 700 
 100 
 1400 
 3375 
 77.3 
 46.1 
 6.6 
 92.1 
 222.1 
 1175 
 700 
 100 
 1400 
 3375 
 77.3 
 46.1 
 6.6 
 92.1 
 222.1 
 7 
 0 
 0 
 0 
 7 
 0.4 
 0.0 
 0.0 
 0.0 
 0.4 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 32MW CW. Flow of 1432MW. Schedule of 1400MW.
Apr 09 
18:29 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 8 / 1 
 4 / 0 
 1 / 0 
 7 / 0 
 20  /  1 
 1125 
 850 
 100 
 847 
 2922 
 75.2 
 56.8 
 6.7 
 56.6 
 195.3 
 1125 
 850 
 100 
 847 
 2922 
 75.2 
 56.8 
 6.7 
 56.6 
 195.3 
 50 
 0 
 0 
 0 
 50 
 3.3 
 0.0 
 0.0 
 0.0 
 3.3 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 100MW CCW. Flow of 1500MW. Schedule of 1400MW.
Apr 09 
19:26 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 5-NM 
 6-NN 
 Total 
 10 / 2 
 4 / 0 
 1 / 0 
 7 / 0 
 22  /  2 
 1375 
 850 
 100 
 1400 
 3725 
 99.4 
 61.5 
 7.2 
 101.2 
 269.4 
 1375 
 850 
 100 
 1400 
 3725 
 99.4 
 61.5 
 7.2 
 101.2 
 269.4 
 2 
 0 
 0 
 0 
 2 
 0.1 
 0.0 
 0.0 
 0.0 
 0.1 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 303MW CCW. Flow of 1696MW. Schedule of 1375MW.
Apr 09 
20:27 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 4-NW 
 5-NM 
 6-NN 
 7-F 
 Total 
 9 / 2 
 5 / 0 
 1 / 0 
 2 / 0 
 6 / 0 
 0 / 2 
 23  /  4 
 1050 
 1050 
 250 
 300 
 750 
 0 
 3400 
 59.3 
 59.3 
 14.1 
 16.9 
 42.4 
 0.0 
 192.0 
 1050 
 1050 
 250 
 300 
 750 
 0 
 3400 
 59.3 
 59.3 
 14.1 
 16.9 
 42.4 
 0.0 
 192.0 
 2 
 0 
 0 
 0 
 0 
 125 
 127 
 0.1 
 0.0 
 0.0 
 0.0 
 0.0 
 74.2 
 74.3 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 241MW CCW. Flow of 1636MW. Schedule of 1395MW.
Apr 09 
21:27 (CST) 
 TLR 3A   NEXT 
 2-NH 
 3-ND 
 Total 
 6 / 3 
 2 / 0 
 8  /  3 
 911 
 125 
 1036 
 95.8 
 13.4 
 109.1 
 911 
 125 
 1036 
 95.8 
 13.4 
 109.1 
 4 
 0 
 4 
 0.4 
 0.0 
 0.4 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 123MW CCW. Flow of 1394MW. Schedule of 1267MW.
Apr 09 
22:27 (CST) 
 TLR 3A   NEXT 
 2-NH 
 6-NN 
 7-F 
 Total 
 0 / 2 
 0 / 2 
 0 / 2 
 0  /  6 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 0 
 0 
 0 
 0 
 0.0 
 0.0 
 0.0 
 0.0 
 450 
 200 
 115 
 765 
 38.2 
 17.0 
 68.1 
 123.2 
 NONE 
 ED-2 
 
 ED-6 
 
 FIRM-7 
 
 Total 
 MISO 
 PJM 
 MISO 
 PJM 
 MISO 
 PJM 
 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0.0 
 0   N/A  N/A LEC 68MW CCW. Flow of 1453MW. Schedule of 1393MW.
Apr 09 
23:28 (CST) 
 TLR 1   CURRENT   NONE   NONE   NONE   0   N/A  N/A LEC 172MW CCW. 1454MW flow. 1285MW schedule.
Apr 10 
00:20 (CST) 
 TLR 0   CURRENT   NONE   NONE   NONE   0   N/A  N/A N/A
 
TLR Schedule Totals
 Priority   Schedule 
 Total Tags 
 Cut / Hold 
 IDC Cut 
 MW 
 RC Cut 
 Acknowledge 
 MW 
 Hold 
 MW 
 0   0   0   0   0 
 1   14   1082   1082   300 
 2   143   19677   18352   2103 
 3   30   6552   6102   199 
 4   1   250   250   0 
 5   13   1400   1300   0 
 6   79   14300   12940   1000 
 7   0   0   0   258 
 Total   280   43261   40026   3860 
 
TLR Market Flow Totals
 Market   Type   Market Relief 
 IDC 
 MW 
 RC 
 Ackn 
 MW 
 MISO   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total MISO   0.0   0.0 
 PJM   ED-2   0.0   0.0 
 ED-6   0.0   0.0 
 FIRM-7   0.0   0.0 
 Total for PJM   0.0   0.0 
 Total   0.0   0.0